Coal Combustion Residuals (CCR) Rule Compliance Data and Information

CCR Documentation

Location Restriction Demonstrations (Oct 4, 2018)  [§257.60(c)(1), §257.61(c)(1), §257.62(c)(1), §257.63(c)(1), §257.64(d)(1)]

Design Criteria

Operating Criteria

  • CCR Fugitive Dust Control Plan (amended Oct 2020)  [§257.80(b)(5)]
  • Annual Fugitive Dust Control Report  [§257.80(c)]
  • Run-on Run-off Control System Plan  [§257.81(c)(3)]
  • Inflow Design Flood Control System Plan  [§257.82(c)(3)]
  • Structural Integrity Assessment  [§257.73(a)(1) through (a)(4), and 275.73(c) through (f)]
    • Exempt, all three surface impoundments are incised with capabilities less than 20 acre-feet and heights less than 20 feet.
  • Annual Surface Impoundment Report  [§257.84(b)(3)]
    • Exempt, all three surface impoundments not subject to the periodic structural stability assessment, since capacity <20 acre-feet and height <20 feet.
  • Annual Landfill Inspection Report  [§257.84(b)(3)]
  • Other CCR-required information will be posted when it is available.