No additional parts are anticipated or required. However, if something is identified as faulty or hazardous with a member’s equipment, the door hanger will provide the member with more information, including why it was unsuccessful and contact information.
Meter Replacement - Install
If the generator is installed correctly to automatically transfer the power source, there is a high probability of it starting. Most auto transfer generators look for loss of voltage for a designated period of time. For most residential generators this is between 10 and 30 seconds. If the generator does start it should only run for about a minute after the new meter is installed and the utility voltage is restored. If the generator is manual it will not start when the meter is exchanged.
Yes, for a few minutes. You will need to reset electronic clocks and other devices.
On the day of the installation, the installer will knock on the member’s door before beginning work. Once the new meter has been installed the installer will leave a door hanger indicating that it was a successful exchange. If the change out was unsuccessful the door hanger will provide the member with more information; including why it was unsuccessful and contact information.
No. Members do not need to be present during the meter change.
Golden Valley does not plan to schedule appointments for meter installations except in rare instances, such as medical emergencies or some commercial accounts. All members will receive a postcard a few weeks before the scheduled meter change out. Members who need more information about scheduling should call (907) 458-5709.
Before the installation, members should make sure to provide safe access to their electric meters by clearing any obstructions, like bushes that need to be trimmed back, items that need to be moved, or gates or cabinets that need to be unlocked. On the day of installation please secure your pets.
Golden Valley employees and contractors will be installing all of the new meters. All meter installers will carry identification.
Members will receive a postcard a few weeks ahead of their scheduled meter change out. Members will also get a reminder call a few days before the installation.
The cooperative is embarking on a system-wide meter replacement program that will change 100% of existing residential and commercial meters.